SYLVESTERSLLC.COM

Project History

Allan Sylvester
Project History

                                                                CONSULTING ASSIGNMENTS – 2016 to 2019

                                                                                SCOPE                                                                  

DOT COST ESTIMATING                      Construction cost estimating and scheduling for DDOT and
                                                                VDOT street, highway, and bridge projects.

CSO TUNNEL PLANNING                     Member of Owner's Advisory Team for planning of                                                                                                      
                                                                Alexandria, VA CSO deep tunnel system.

CONSTRUCTABILITY                            Constructability reviews for dam penstock underground concrete
REVIEWS                                               lining operation, transit upgrades and NEBT CSO Tunnel project. 

TUNNEL CONTRACTOR                       Work with various construction contractors to provide
COST ESTIMATING                               constructability reviews and pricing for underground
                                                                transit and CSO construction projects.                                                       

BUSINESS DEVELOPMENT                  Assist several consulting engineering firms
                                                                helping them to grow their Mid-Atlantic operations.

 

                                                                                        CONSTRUCTION PROJECTS – 2015 TO 2010

PROJECT                                                  SCOPE                                                                                     ROLE

WASHINGTON BLVD BRIDGE             Replacement of 6-lane VDOT bridge                          Division Manager-
Alexandria, VA                                      carrying Route 27 over Route 110, adjacent            Responsible for estimate, hiring of staff,
                                                                 to Pentagon. W
orking adjacent to WMATA            & construction management
                                                                 tunnel portal 
added a level of complexity to job.                                       

WATERMAIN CONTRACTS                   Replacement of 40,000 lf of 8 in diameter              Operations Manager-
Washington DC                                     water mains at 15 locations in Wash DC.                Resp. for hiring & con-
                                                                                                                                                         
struction management.

SHOT TOWER STATION                        Structural strengthening of 3-cell box                     Operations Manager-
Baltimore, MD                                       culvert spanning atop operating subway                Resp. for estimate,
                                                                 
station.  This was the first project for NYC              hiring of staff & con-
                                                                 
contractor outside of their home market                struction management.
                                                                 of
NY.

INTERCOUNTY CONNECTOR               Design-Build of $514 million toll road in               Managed 5-way JV
Calverton, MD                                       Maryland greenfield.  Includes 50,000 lf of           team for estimate 
                                                                 
6-lane highway with 21 bridges. Geotechnical     preparation, proposal 
                                                                 
challenge of building an interchange over            development, design
                                                                
 unconsolidated wash pond settlement basins      and construction man-
                                                                 
was overcome with innovative in-house                agement.
                                                                 
engineering solution.                                                                  

IAD PEOPLE MOVER                             Three contracts for construction of cut-and-        Managed JV team
Dulles, VA                                              cover stations, twin TBM tunnels, twin SEM          from estimate prep-
                                                                
tunnels, and running track cut-and-cover             aration through con-
                                                                
box structures, all on airfield side of operating     struction manage-
                                                                
airport.                                                                          ment.

                                                                 

                                                                For work history prior to 2010, please contact us

Website Builder